Top of Main Content

Project info

  • Sheffield, MA
  • 2004

Working under an extremely accelerated schedule, twin, side-by-side multi-purpose synthetic turf fields were designed and constructed in 5 months. The fields are lined for soccer and field hockey. The handicapped accessible facility includes innovative design details to maintain access to an existing sanitary sewer infrastructure.