Top of Main Content

Project info

  • Leominster, MA
  • 2023
  • 30,000 SF

KBA worked with the Town of Leominster to evaluate sites, develop a space needs program, and design a new police station to replace the existing antiquated facility.  Three potential sites narrowed down from a list of 11, were evaluated for size, accessibility, location, access to utilities, and topography.

Features of the new facility include a training/emergency operations center, dispatch center, secure prisoner processing and detention area, drive-thru sally port, secure evidence processing and storage area, roll call room, fitness area, offices, and a firing range. The upgraded facility provides more space and additional health and safety features and is energy efficient with many sustainable elements.