Top of Main Content

Project info

  • Canton, MA
  • 2005
  • 240,000 SF

The design of this facility connects and condenses three buildings into one school. The gymnasium was transformed into the media center, and the cafeteria became the art room. Extensive renovations including replacement of the roof with a new white reflective PVC membrane, HVAC and electrical system upgrades, a more defined front entrance, and code updates to the existing building were also completed.